Service area

Groundworks and installation

We prepare your site for networks: excavation, cable routes, poles and engineering infrastructure.

How the solution works
Ethernet network switch
Pipe at an excavation site
Engineer reviewing project blueprints

Select a stage to explore the work

Ethernet network switch — Dima Krivoy · Pexels Pipe at an excavation site — Sergei Starostin · Pexels Engineer reviewing project blueprints — ANTONI SHKRABA production · Pexels

Survey. Establish the route, existing utilities, access and scope boundaries.

Trench. Excavate and prepare the bedding to the design.

Ducts & entry. Lay the protective route and prepare the building entry.

Reinstatement. Inspect, backfill and hand over the agreed reinstatement.

Service directions 12 ↗
How we approach the work

What this service covers

We start with a site survey, route planning and identification of existing utilities. Design, required permissions, scope and reinstatement are agreed before work starts.

Trenching

We check existing utilities and machinery access before marking the route. Excavation method, spoil handling and removal are agreed for the site. Trench dimensions follow the design and ground conditions rather than a single standard depth.

Cable routes and protective ducts

We prepare duct bedding, join sections and form building entries. We check that ducts are clear and include pull-through access and spare capacity where specified. The route is recorded before backfilling.

Poles and mounting structures

We agree positions, foundations, loads and cable or equipment placement. Poles, brackets and fixings are installed to the agreed design. Power, earthing and extra structures are separately scoped when needed.

Backfill and reinstatement

Before closing the route, we inspect the installed works. Protective layers, backfill and compaction follow the specification. Reinstatement of soil, landscaping, asphalt or paving and the handover process are agreed beforehand.

Illustrative scenario · not a completed project

How this could work at your site

A new warehouse needs a link to the office across the company site. We survey and agree the route, excavate and install protective ducts, then record, backfill and reinstate it. Fibre pulling and network setup can be included in the same project.

Discuss a project ↗
  1. Survey

    Establish the route, existing utilities, access and scope boundaries.

  2. Trench

    Excavate and prepare the bedding to the design.

  3. Ducts & entry

    Lay the protective route and prepare the building entry.

  4. Reinstatement

    Inspect, backfill and hand over the agreed reinstatement.

What you receive

Deliverables and handover

  • A prepared route and entries for utility installation.
  • An as-built route diagram and agreed completion records.
  • Site reinstatement within the approved scope.
Construction licences and certificates ↗

Scope, equipment, schedule and price are agreed after reviewing your requirements and surveying the site where needed. This example illustrates the approach; the final design is tailored to your site.